Hydropower Project Studies and Feasibility

Studies and feasibility assessment represent the first and most critical step in the development of hydropower projects. At this stage, hydrological, geological, climatic, and technical-economic conditions of the project site are thoroughly examined, existing potentials are identified, and the best implementation options are selected.
2

Feasibility Studies for Hydropower Energy Recovery Projects in Water-Intensive Industries

ChatGPT said: In large industries and companies with water-intensive processes—such as steel, petrochemical, paper, textile, and treatment plants—large volumes of water flow at significant pressure and velocity through their systems. This flow is often released without utilization, causing the embedded energy to be wasted. Hydraulic energy recovery projects, using appropriate equipment and technologies, enable the conversion of this energy into usable electricity or mechanical power.
3

Phase One Studies for Hydropower Projects

Phase One studies for hydropower projects are a key part of the project development cycle, focusing on preliminary design and defining the main specifications of the power plant. This phase begins after feasibility studies and aims to provide a foundational design to guide subsequent design and implementation stages.
4

Preparation of Basic Drawings for Hydropower Projects

"Basic Design Drawings are considered one of the vital components in the design and implementation process of hydropower projects. These drawings serve as the main reference for detailed design, equipment procurement, and project execution, ensuring clarity and consistency throughout the entire process."
5

Preparation of Purchase Orders and Procurement of Equipment for Hydropower Projects

"One of the most vital stages in the execution of hydropower projects is the procurement of high-quality equipment and spare parts in accordance with international standards. Effective management of the procurement process—from needs assessment to supply and final delivery—ensures project success and reduces execution risks."
6

Preparation of Detailed Electrical and Mechanical Drawings for Hydropower Projects

"Detail Design Drawings represent a key stage in the design of hydropower projects, providing precise execution details of equipment and systems. These drawings are prepared after the feasibility studies and basic design stage, serving as the main reference for contractors and equipment suppliers during installation and commissioning."
7

Technical Expertise in Inspection and Handover of Electrical and Mechanical Equipment for Hydropower Units"

"Inspection and handover of equipment in hydropower projects is a critical step in ensuring the quality, safety, and optimal performance of the power plant. By executing this process meticulously, it is ensured that all equipment is manufactured in accordance with technical specifications and international standards, and is ready for installation and commissioning."
8

"Capability to Perform Installation, Testing, and Commissioning of Hydropower Units"

"Successful execution of hydropower projects requires precise installation of equipment, technical testing, and commissioning of units to ensure that the plant operates according to the design specifications. This stage represents the final link between design and actual project operation."
9

"Capability and Experience in Operation, Maintenance, and Servicing of Hydropower Units"

"Continuous operation and proper maintenance of hydropower units are key factors in ensuring stable performance, extending equipment lifespan, and reducing operational costs. Experience and expertise in managing operation and maintenance processes enable timely identification of defects and effective resolution of issues."
10

"Capability to Manufacture Pelton, Francis, and Turgo Hydroturbines for Small-Scale Projects"

"Small-scale turbines are among the most important components of hydropower plants under 10 MW, playing a key role in the optimal utilization of water resources. The design and manufacturing of these turbines require high technical expertise and practical experience in hydraulics and precision mechanics."
11

"Capability to Manufacture Pumped-Storage Units for Energy Storage and Hybridization of Wind and Solar Power Plants"

"Pumped Storage Units play a crucial role in optimizing energy consumption and enhancing the stability of renewable power grids. These units enable energy storage during periods of excess generation and its injection during peak demand, ensuring hybrid and reliable operation when integrated with wind and solar power plants."
12

"Capability to Manage Industrial Plant Projects in the Water and Energy Sector"

"Effective management of industrial projects in the water and energy sector is a key factor in achieving the technical, economic, and environmental objectives of plants. Experience and expertise in project management, precise planning, coordination of technical teams and contractors, and supervision of various implementation stages help reduce risks and enhance productivity."